CATEGORY
LOCATION
SECTOR
AREA
NET
TOTAL
YEAR
The project envisages the construction of a new single-storey production building for the drying and storage of non-combustible ceramic material.
The main entrance is located on the northern side, with additional entrances provided on the southern and western sides, ensuring convenient access and functional operation of the building.
The production process involves the receipt of raw materials – clay press powder, delivered by road transport, followed by its processing. After unloading, the material passes through an automated screening system and is conveyed by a bucket elevator to storage silos for homogenisation and ageing. Once this process is complete, the ceramic material is packed into bulk bags (big bags), prepared for dispatch and transported to the recipients for further use in the production of ceramic products.
The design combines functionality, process efficiency and reliability, ensuring optimal organisation of production activities, safe operation and conditions for the long-term and efficient functioning of the facility.
Project drawings





Quality design solutions focused on functionality and value.
Legal





